News

Two banks of the Danube are reconnected – Zezelj Bridge

After many problems in implementation and postponements final works on the Zezelj Bridge arches are connected and bridge passes from the 20 October 2017, Friday 5.25 pm. Works started on the 16 October 2017. The most important is that two banks of the Danube are reconnected and Zezelj Bridge brings us better conditions for navigation in the future. The bridge will be in operation for other types of traffic in the early spring of 2018.
Secretariat of DC was dealing with this topic and organized meeting with main constructor AZVI company on the 24 August 2017 in Budapest.